More kilometres. Less downtime.

For last-mile and other brake-intensive LCV fleets. Brakes are not just a spare part, they are an operating cost. The GOTEC LongLife hard coated disc cuts both: costs and fine dust.

Fewer stops. Lower costs.

Model calculation per front axle over 200,000 km: GOTEC LongLife vs. standard grey cast iron, including workshop, downtime, pads and discs.

8 → 2workshop stops
−69%total operational cost
€1,640saved per vehicle

Total operational cost

front axle · 200,000 km

Standard grey cast iron
€800€630€520€440
€2,390
GOTEC LongLife
€750
Workshop labourVehicle downtimePadsDiscs
A fleet of 100 vehicles saves around€164,000and gains 600 vehicle-hours back on the road.

What fleet managers really measure

Frequent stops, high utilisation and tight delivery windows make every extra workshop visit expensive. That is why the total cost of the braking system matters, not the part price.

  • Brake cost per kilometreParts, labour and change frequency over the mileage.
  • Vehicle availabilityHow often the vehicle has to leave service for brake work.
  • Service intervalsFewer workshop visits, fewer interruptions in operation.
  • Total cost of ownershipThe economic effect over the entire holding period.

Standard vs. GOTEC

MetricStandard (baseline)GOTEC LongLife
Disc life~50,000 km>200,000 km
Pad life~25,000 km~100,000 km
Workshop stops per 200,000 km82
Operational cost per 200,000 km (front axle)€2,390€750

Model assumptions from GOTEC documentation. Target values and savings must be validated in real fleet operation.

What could your fleet save?

Enter your figures. All fields are pre-filled with the model assumptions and can be changed.

Your fleet
Cost per workshop visit
Parts and intervals

Indicative result

–saving per vehicle over the holding period
  • Whole fleet–
  • Per vehicle and year–
  • Savings in operation–
  • Higher purchase price–
  • Workshop visits standard → GOTEC–
  • Pays back after–
  • Mileage per vehicle–

Calculated per front axle, including first fitting. A disc change includes new pads. The result is a simulation, not a guarantee: actual values depend on vehicle, duty profile, procurement and workshop structure.

Send result and request pilot

Measure, don't guess.

We test your business case with real data from your fleet.

↑